Independent research tool — not a government agency. Official notices govern.Refreshed
ClosedOpportunity F22AS00164

Shiawassee NWR Greenpoint Long Pond Wetland Restoration

Fish and Wildlife Service · Department of the Interior

At a glance

Shiawassee NWR Greenpoint Long Pond Wetland Restoration is a closed federal cooperative agreement opportunity from the Fish and Wildlife Service (Department of the Interior). The application deadline was March 28, 2022. Individual awards are listed as $650K – $756K, with $756K in total estimated funding. Applicant types listed as eligible include 501(c)(3) nonprofits and others (see notice). Cost sharing is not required. It is funded under Assistance Listing 15.654 (National Wildlife Refuge System Enhancements).

Summary assembled from the official notice's fields. The official notice governs.

Key facts

Posted
Jan 25, 2022
Close date
Mar 28, 2022
Award floor
$650,000
Award ceiling
$756,200
Est. total funding
$756,200
Expected awards
Not specified
Cost sharing
Not required
Funding instrument
Cooperative Agreement
Opportunity category
Discretionary

Who can apply

  • 501(c)(3) nonprofits
  • Others (see notice)

Additional information on eligibility (from the notice)

501(c) 4 or 501(c) 5 nonprofit organizations are also eligible to apply.

Based on the published notice. Review the official notice for complete eligibility requirements.

What it funds

Official synopsis as published by the agency, formatted for readability.

The U.S. Fish and Wildlife Service (Service) at Shiawassee National Wildlife Refuge (NWR) is looking to award one cooperative agreement for engineering, survey, design, and construction management services of the long pond.  The long pond is located on the former Germania golf course which is now part of the Refuge.  The long pond is a former irrigation pond located near the Tittabawassee River and in it's current condition has steep vertical walls and provides little to no habitat value and poses a safety concern for visitors to the Refuge.  The Service seeks to award this cooperative agreement to an entity that can survey they existing pond, develop a restoration design in collaboration with the Service which will connect the long pond to the Tittabawassee River and soften the existing vertical banks of the long pond.  Preliminary estimates show that this may require relocating up to 20,000 cubic yards of earth.  This site is located within the floodplain of the Tittabawasee River and the design will require direction and oversight from the Service to ensure that the design complies with all State and Federal wetland/floodplain/clean water act permits.  The Service has already held pre-appplication meetings with local, State, and Federal regulators to ensure this project is permitable and complient with existing laws.  The awardee will provide a complete set of design plans that will be used by the Service to apply for local, State, and Federal permits.  Furthermore, this project will involve removal of several miles of asphalt golf cart paths that run throughout the entire former golf course.  Once all permits have been issued the awardee will provide construction management to complete the project.
Construction management services will include:

Development of a federal procurement compliant bid package and solicitation of bids from sub-contractors to complete the work of the long pond and removal of cart paths.
Provide construction management, oversight, and on-site inspections of all aspects of construction to ensure all aspects of the project are built to design specifications. 
Ensure all contractors wash and clean equipment prior to entering Refuge (as outlined in the design plans) to prevent invasive species spread.
Ensure all fuel stored on the Refuge by sub-contractors is compliant with the Service policy for fuel storage and containment.
Ensure any damage to existing Refuge infrastructure (roads, trails, signs, gates, observation platforms) are repaired to pre-construction condition (this may include but not limited to road grading and dike repair upon completion of the project).
Routinely communicate construction activities, timelines, and any issues that may cause delays with the Service program officer.
Provide final survey of project to the Service in an ArcGIS and AutoCAD compatible format.

The Service will be substantially involved in this project through the following:

Provide all local, state, and federal construction and environmental permits.
Provide on-site local knowledge of area and conditions.
The Service will work with the awardee and subcontractors to develop a timeline for construction activities that considers: wildlife disturbance, flooding and/or changing river levels, daytime and any proposed night time operations (must be approved in advance), and public use (e.g., hiking trails, observation platforms, and any other public use that may be impacted).
The Service will approve all haul routes and the Service must approve roads that can be used by awardee and their subcontractor prior to construction, any requests for alternative routes must be approved in advance.
Any organization that would like to see the project area in person much contact the Service program officer listed in the NOFO no later than 10 days prior to the closing of the announcement to schedule a site visit.

Assistance Listing

What is an ALN?

Reported obligations under ALN 15.654

Historical data · not a prediction
FY24$75.7M
FY25$121M
FY26$40M est.
Source: SAM.gov Assistance Listing 15.654. Program-wide totals, not awards from this specific opportunity.

Agency contact (as published)

Fish and Wildlife Service
Eric_Dunton@fws.gov
22041-3803

Quick answers

Who is eligible to apply for “Shiawassee NWR Greenpoint Long Pond Wetland Restoration”?

The official notice lists these applicant types as eligible: 501(c)(3) nonprofits and Others (see notice). Additional restrictions may apply; review the full notice.

How much funding is available through “Shiawassee NWR Greenpoint Long Pond Wetland Restoration”?

Per the notice, individual awards are listed as $650k – $756k and total estimated program funding is $756,200.

How do I apply for “Shiawassee NWR Greenpoint Long Pond Wetland Restoration”?

Applications are submitted through the official source, not through GrantsJunction. Open the official notice on Grants.gov (opportunity F22AS00164), and review the full announcement and application package. Organizations applying through Grants.gov generally need an active SAM.gov registration and a Grants.gov account, which can take several weeks to set up.

Matched on shared Assistance Listings, agency, categories and eligible applicant types.